Web design

Website Redesign Checklist: Before, During and After Launch

Website Redesign Checklist: Before, During and After Launch
Short answerBefore a redesign, set goals, benchmark traffic and conversions, crawl the current site and audit content. During the build, keep URLs where possible, map redirects for every changed URL and build accessibility in. On launch day, apply redirects, check tracking and submit the sitemap. After launch, monitor Search Console, 404s and conversions for several weeks.

Key takeaways

  • Benchmark traffic, rankings and conversions before you change anything.
  • Keep URLs where you can; redirect the rest one-to-one.
  • Don't drop content that ranks without a plan.
  • Test forms, tracking and checkout before launch.
  • Monitor closely for at least four to six weeks.

Before the redesign

  • Define goals: more leads, better conversion, new services, new brand.
  • Record a baseline: traffic, top pages, rankings, conversions.
  • Crawl the site and export every URL.
  • Audit content: keep, improve, merge or remove.
  • Gather brand assets, photography and testimonials.

During design and build

  • Plan the sitemap and navigation around how customers search.
  • Keep URLs that perform; map redirects for the rest.
  • Build to WCAG accessibility standards.
  • Carry over titles, meta descriptions and schema.
  • Keep the staging site blocked from indexing.

Launch day

  • Apply redirects and test a sample.
  • Remove staging noindex settings.
  • Check analytics, ads and conversion tracking.
  • Submit the sitemap in Search Console and Bing Webmaster Tools.
  • Test forms and checkout on mobile and desktop.

After launch

  • Watch Search Console coverage and 404s daily for the first week.
  • Compare traffic and conversions with the baseline.
  • Fix issues quickly and keep redirects in place permanently.

How we can help

We redesign websites and stores with SEO protection built into the process. See website design, Shopify redesign and our web design process.

Need help with this?Our website design service covers exactly this. Book a discovery call.
Free 10-point Shopify audit

Send us your store URL and we'll email you the fixes that matter most. No call needed.

Get my audit

Frequently asked questions

Will a redesign hurt my SEO?

It can if URLs change without redirects or ranking content is removed. With a redirect map and content plan, rankings usually hold.

How long does a website redesign take?

Small business sites often take 4 to 10 weeks; larger sites longer.

Should I change my URLs?

Only when there's a clear benefit. Every change needs a 301 redirect.

When is the best time to launch?

A quieter period for your business, early in the week, so issues can be fixed quickly.

Karol Djana

Founder of The Silver Arc, a remote-first Shopify Select Partner studio. Karol leads design and development on the studio's store builds, websites, migrations and B2B projects.

Let's talk

Have a Shopify project in mind?

Tell us what you are building. We will reply with questions, an honest recommendation and next steps, usually within one working day.

Book a call